SHOP BY PROJECT
Multi-site Deployment
Connect solar, wind and EV sites with remote access and resilient networks.
Explore this project
Click an equipment marker or label to see matching product options.

Illustration and activity lights are schematic, not live telemetry or an installation design. Confirm the exact equipment and installation requirements before ordering.
Other requirements — not pictured in detail
Plan requirements and check compatibility
Connectivity and network infrastructure for distributed energy and charging sites. Solar panels, turbines, chargers and their electrical design are outside this guide.
Define what you need
These requirements narrow your choices. Product specifications and system compatibility still need checking.
10 solar sites: start with one gateway per independent site (10 total), then validate redundancy and interfaces per site. Backhaul: Cellular primary. SIM/data and remote-management services are separate requirements.
What needs to match?
Industrial gateway / router
Connects each site controller to the operations network.
Before you buyConfirm Ethernet/serial needs, VPN, modem bands, voltage range, operating temperature and service coverage.
Industrial switching
Connects local controllers, monitoring and cameras where more ports are needed.
Before you buyCount ports per site. Check temperature range, enclosure, power input, DIN mounting and fibre/SFP compatibility.
Antennas, enclosures & power
Supports reliable connectivity in the actual site environment.
Before you buySurvey signal and power. Match antenna connectors/bands; verify enclosure ingress rating, condensation protection and surge protection.
Remote management & service
Supports fleet monitoring, configuration and access across sites.
Before you buyCheck device support, recurring licences, SIM/data costs, access controls and lifecycle support. OCPP or SCADA support belongs to verified controllers/platforms, not an assumed router feature.
Your project plan
No products saved yet. Save candidates as you compare, or download your requirements for a fit check. This is a planning list, not a validated kit.
Prices and availability can change. Purchase individual items on their product pages after checking the full specifications. Your plan stays in this browser tab’s session.Project questions
How many gateways are needed?
One per independent site is a starting assumption. Separate local networks, controller interfaces, redundancy and coverage can change the design. Size switches and antennas per site rather than multiplying one unverified kit across the estate.
Are chargers, panels or turbines included?
No. This is a connectivity guide. Confirm the selected controller or charger interfaces and platform requirements separately. OCPP and SCADA support are not assumed router features.
What recurring services should I budget for?
Check SIM/data plans, remote management licences, VPN endpoints, monitoring and support. Verify exact device/platform compatibility and who operates the estate before ordering hardware.
